February 2006

Wednesday 1 Feb. The ground floor walls are about halfway up.

The door between the garage and the larder/wine cellar is the first to be complete.

The south side with the bay windows to one of the bedrooms and the dining room take shape.

The wine cellar without wine (garage to the right).

The larder without lard (garage to the left).

Thursday 2 Feb (concrete pour tomorrow!)

The West elevation reaches first floor level; dining room and kitchen on this side.

The East elevation goes up quickly too; two bedrooms and a bathroom over here.

The closest I can get to an aerial shot, with the garage incorporating glass block windows in the foreground.

The North elevation showing another bedroom and the main entrance.

From left to right: the main entrance, family room, shower room and garage.