March 2007

About half of the roofing slates were fitted by March.

The underground potable water tank was delivered. This will be supplied by the borehole after being treated for iron and manganese. The water will then be pumped through a UV filter and on to the house when required.

On the back of the house the roofing is less complete.

And on the south side we haven't even started.

Internally ceiling frames have been fitted (only one photo of them as they are not very exciting).

And the willow windbreak has been planted (over 200 setts over a 30 metre length).